Installation guide

Nth Wired 5 375x280px@3x

Step 1: installing the wall bracket

  • 1. Use a spirit level to make sure the bracket is lined up correctly. Mark each corner with the pencil as your reference points. Important: depending on the orientation of the wall bracket, you can choose to install your Netatmo Thermostat with the screen displayed either vertically or horizontally.
  • 2. Drill four 6 mm holes at these markings. Then hammer in the 4 wall plugs provided.
  • 3. Using a screwdriver, secure the bracket by inserting the 4 screws provided into the wall plugs you just fitted. Next, screw the boiler control wires into the electrical connectors on the bracket and isolate the remaining wires, if needed.